PCC IN FOUNDATION (1:4:8)
Providing and laying in position plain cement concrete of specified grade excluding the cost of centering and shuttering — All work up to plinth level (1 cement : 4 coarse sand : 8 graded stone aggregate 20mm & down).
Nominal Mix
0. Project Details (Optional)
Select PCC Grade
GradeM5
Mix Ratio1 : 4 : 8
Cement / m³3.42 Bags
Sand / m³0.474 m³
Aggregate / m³0.948 m³
Agg Size20mm & down
1. Measurement
2. Material Rates
Smart Material Density — Material Rate Calculator
A professional tool to verify material quantity, actual density, and multi-unit rate conversions using site measurement data.
Read Now
3. Wastage (%)
4. Labour Rates
5. Machinery Rates (per m³ Rs.)
Concrete Mixer & Vibrator Cost
A professional guide to calculate mixer machine cost, energy cost, and vibrator depreciation — expressed as ₹ per m³ for accurate analysis.
Read Now
6. Overheads & Profit (%)
Description of Work
| Description of Item | Qty | Unit | Rate (Rs.) | Amount (Rs.) |
|---|
TOTAL ESTIMATED COST
Rs. 0
Rate this Calculator
Your feedback helps us improve our engineering tools!
No comments: