PCC Calculator Thumbnail
Calculator Thumbnail

PCC IN FOUNDATION (1:4:8)

Providing and laying in position plain cement concrete of specified grade excluding the cost of centering and shuttering — All work up to plinth level (1 cement : 4 coarse sand : 8 graded stone aggregate 20mm & down).
Nominal Mix
0. Project Details (Optional)
Select PCC Grade
GradeM5
Mix Ratio1 : 4 : 8
Cement / m³3.42 Bags
Sand / m³0.474
Aggregate / m³0.948
Agg Size20mm & down
1. Measurement
2. Material Rates
Smart Material Density — Material Rate Calculator
A professional tool to verify material quantity, actual density, and multi-unit rate conversions using site measurement data.
Read Now
3. Wastage (%)
4. Labour Rates
5. Machinery Rates (per m³ Rs.)
Concrete Mixer & Vibrator Cost
A professional guide to calculate mixer machine cost, energy cost, and vibrator depreciation — expressed as ₹ per m³ for accurate analysis.
Read Now
6. Overheads & Profit (%)

RATE ANALYSIS REPORT - PCC M5 (1:4:8)

Description of Work
GradePCC M5
Mix Ratio1 : 4 : 8
Volume10 m³
Description of Item Qty Unit Rate (Rs.) Amount (Rs.)
TOTAL ESTIMATED COST Rs. 0
Analysis Rate: 0 per  |  (Rate for Analysis Purposes Only)
Export / Download Report

Rate this Calculator

Your feedback helps us improve our engineering tools!

Related Calculators & Guides
Leave a Comment

No comments: