PILE WORK
BORED CAST-IN-SITU PILE
Boring, providing and installing bored cast-in-situ RCC piles of specified diameter and length including reinforcement and concreting.
PILE LOAD TEST
Vertical load testing of piles as per IS 2911 (Part-IV) including kentledge arrangement and preparation of test pile head.
PILE CAP CONSTRUCTION
Providing and laying reinforced cement concrete pile cap of specified grade including formwork and reinforcement.
UNDER-REAMED PILE
Providing and constructing under-reamed piles with bulb formation as per design including boring and concreting.
PILE BORING IN HARD ROCK
Boring through hard rock strata using chisel and bailor or rotary method for pile foundation.