Calculator Thumbnail

EXCAVATION IN ORDINARY SOIL | 0.0m to 1.5m Depth

Excavation work by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
Volume Based
0. Project Details (Optional)
Select Execution Method
Manual Method: Requires Beldars for digging and Coolies for lifting/disposal. Best for small volumes or restricted spaces. Rate analysis is generated dynamically based on your input volume.
1. Measurement (Excavation Vol.)
Convert CFT to m³ automatically.
2. Labour Rates (per Day Rs.)
3. Shoring & Dewatering
4. Overheads & Profit (%)
Calculate Exact Overheads %
Don't guess overheads blindly! Use our advanced calculator to derive precise site and head-office overhead percentages.
Calculate Now

RATE ANALYSIS REPORT - EXCAVATION IN ORDINARY SOIL

Description of Work
MethodManual
Soil TypeOrdinary / Soft Soil
Volume10 m³
Description of Item Qty Unit Rate (Rs.) Amount (Rs.)
TOTAL ESTIMATED COST Rs. 0
Analysis Rate: 0 per  |  (Rate for Analysis Purposes Only)
Export / Download Report
Share this Calculator

Rate this Calculator

Your feedback helps us improve our engineering tools!

Related Calculators & Guides
Leave a Comment

No comments: