Calculator Thumbnail

SAND FILLING & COMPACTION

Supplying and filling sand in plinth, under floors, or in foundation trenches, including watering (flooding), ramming, and consolidating. Includes 20% material bulkage for compaction.
Material Included
0. Project Details (Optional)
Select Compaction Method
Manual Method: Requires Beldars for spreading sand, and extra Waterman (Bhisti) for heavy flooding and hand ramming to achieve solid settlement.
1. Measurement (Filling Volume)
Convert CFT to m³ automatically.
2. Material Rates
20% extra volume added in calculation for shrinkage/compaction.
3. Labour Rates (per Day Rs.)
For spreading sand
For heavy flooding/watering
4. Overheads & Profit (%)
Calculate Exact Overheads %
Don't guess overheads blindly! Use our advanced calculator to derive precise site and head-office overhead percentages.
Calculate Now

RATE ANALYSIS REPORT - SAND FILLING & COMPACTION

Description of Work
Compaction MethodManual
MaterialImported Sand
Compacted Volume10 m³
Description of Item Qty Unit Rate (Rs.) Amount (Rs.)
TOTAL ESTIMATED COST Rs. 0
Analysis Rate: 0 per  |  (Rate for Analysis Purposes Only)
Export / Download Report
Share this Calculator

Rate this Calculator

Your feedback helps us improve our engineering tools!