Calculator Thumbnail

EXCAVATION IN HARD ROCK (1.5M TO 3.0M)

Excavation work in hard rock (requiring chiseling/wedging or blasting) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated rock lead upto 50 m and lift upto 1.5 m, PLUS extra lift of 1.5m (Total Depth 1.5m to 3.0m).
Extra Lift (Rock)
0. Project Details (Optional)
Select Execution Method
Manual Method: Requires extensive Beldars for chiseling/wedging and extra Coolies for lifting/staging broken rock from 1.5m to 3.0m depth. Highly labor-intensive.
1. Measurement (Excavation Vol.)
Convert CFT to m³ automatically.
2. Labour Rates (per Day Rs.)
3. Shoring & Dewatering
4. Overheads & Profit (%)
Calculate Exact Overheads %
Don't guess overheads blindly! Use our advanced calculator to derive precise site and head-office overhead percentages.
Calculate Now

RATE ANALYSIS REPORT - HARD ROCK (1.5M TO 3.0M)

Description of Work
MethodManual (Chiseling)
Soil/Rock TypeHard Rock (Deep)
Volume10 m³
Description of Item Qty Unit Rate (Rs.) Amount (Rs.)
TOTAL ESTIMATED COST Rs. 0
Analysis Rate: 0 per  |  (Rate for Analysis Purposes Only)
Export / Download Report
Share this Calculator

Rate this Calculator

Your feedback helps us improve our engineering tools!

Related Calculators & Guides