HARD ROCK EXCAVATION (3.0M TO 5.0M)

Excavation work in hard rock (requiring chiseling/wedging or blasting) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out rock lead upto 50 m and lift upto 1.5 m, PLUS multiple extra lifts for extreme depth (3.0m to 5.0m).
Double Extra Lift
0. Project Details (Optional)
Select Execution Method
Manual Method: Requires extremely high Beldar counts for confined deep chiseling, and massive Coolie counts for double staging/lifting rock from 3-5m depth.
1. Measurement (Excavation Vol.)
Convert CFT to m³ automatically.
2. Labour Rates (per Day Rs.)
3. Shoring & Dewatering
4. Overheads & Profit (%)
Calculate Exact Overheads %
Don't guess overheads blindly! Use our advanced calculator to derive precise site and head-office overhead percentages.
Calculate Now

RATE ANALYSIS REPORT - HARD ROCK (3.0M TO 5.0M)

Description of Work
MethodManual (Chiseling)
Soil/Rock TypeHard Rock (Extreme Deep)
Volume10 m³
Description of Item Qty Unit Rate (Rs.) Amount (Rs.)
TOTAL ESTIMATED COST Rs. 0
Analysis Rate: 0 per  |  (Rate for Analysis Purposes Only)
Export / Download Report
Share this Calculator

Rate this Calculator

Your feedback helps us improve our engineering tools!

Calculator Thumbnail

EXCAVATION IN HARD ROCK (1.5M TO 3.0M)

Excavation work in hard rock (requiring chiseling/wedging or blasting) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated rock lead upto 50 m and lift upto 1.5 m, PLUS extra lift of 1.5m (Total Depth 1.5m to 3.0m).
Extra Lift (Rock)
0. Project Details (Optional)
Select Execution Method
Manual Method: Requires extensive Beldars for chiseling/wedging and extra Coolies for lifting/staging broken rock from 1.5m to 3.0m depth. Highly labor-intensive.
1. Measurement (Excavation Vol.)
Convert CFT to m³ automatically.
2. Labour Rates (per Day Rs.)
3. Shoring & Dewatering
4. Overheads & Profit (%)
Calculate Exact Overheads %
Don't guess overheads blindly! Use our advanced calculator to derive precise site and head-office overhead percentages.
Calculate Now

RATE ANALYSIS REPORT - HARD ROCK (1.5M TO 3.0M)

Description of Work
MethodManual (Chiseling)
Soil/Rock TypeHard Rock (Deep)
Volume10 m³
Description of Item Qty Unit Rate (Rs.) Amount (Rs.)
TOTAL ESTIMATED COST Rs. 0
Analysis Rate: 0 per  |  (Rate for Analysis Purposes Only)
Export / Download Report
Share this Calculator

Rate this Calculator

Your feedback helps us improve our engineering tools!