Calculator Thumbnail

EXCAVATION IN ORDINARY SOIL | 1.5m to 3.0m Depth

Excavation work by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, PLUS extra lift of 1.5m (Total Depth 1.5m to 3.0m).
Extra Lift Added
0. Project Details (Optional)
Select Execution Method
Manual Method: Requires Beldars for digging and Coolies for lifting/disposal. Rate includes additional labor required for extra depth (1.5m to 3.0m).
1. Measurement (Excavation Vol.)
Convert CFT to m³ automatically.
2. Labour Rates (per Day Rs.)
3. Shoring & Dewatering
4. Overheads & Profit (%)
Calculate Exact Overheads %
Don't guess overheads blindly! Use our advanced calculator to derive precise site and head-office overhead percentages.
Calculate Now

RATE ANALYSIS REPORT - EXCAVATION (1.5M to 3.0M)

Description of Work
MethodManual
Soil TypeOrdinary / Soft Soil
Volume10 m³
Description of Item Qty Unit Rate (Rs.) Amount (Rs.)
TOTAL ESTIMATED COST Rs. 0
Analysis Rate: 0 per  |  (Rate for Analysis Purposes Only)
Export / Download Report
Share this Calculator

Rate this Calculator

Your feedback helps us improve our engineering tools!

Related Calculators & Guides
Leave a Comment

No comments: