HARD ROCK EXCAVATION (3.0M TO 5.0M)
Excavation work in hard rock (requiring chiseling/wedging or blasting) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out rock lead upto 50 m and lift upto 1.5 m, PLUS multiple extra lifts for extreme depth (3.0m to 5.0m).
Double Extra Lift
0. Project Details (Optional)
Select Execution Method
Manual Method: Requires extremely high Beldar counts for confined deep chiseling, and massive Coolie counts for double staging/lifting rock from 3-5m depth.
1. Measurement (Excavation Vol.)
2. Labour Rates (per Day Rs.)
3. Shoring & Dewatering
4. Overheads & Profit (%)
Calculate Exact Overheads %
Don't guess overheads blindly! Use our advanced calculator to derive precise site and head-office overhead percentages.
Calculate Now
Description of Work
| Description of Item | Qty | Unit | Rate (Rs.) | Amount (Rs.) |
|---|
TOTAL ESTIMATED COST
Rs. 0
Rate this Calculator
Your feedback helps us improve our engineering tools!